Improving Walking and Cycling Connections in Huntingfield
Kingborough Council is planning to start construction of a new shared path between Sirius Drive and the Huntingfield Park & Ride facility in October 2026, subject to contractor’s availability.
The project will create a safer and more accessible route for people walking, riding scooters, using mobility devices and cycling between nearby residential areas and public transport facilities.
The new path will improve connections to the Huntingfield Park & Ride, reduce the need for short vehicle trips and provide a safer alternative to walking or cycling on road shoulders.

What Work Will Be Carried Out?
The project includes:
- Construction of a new concrete shared path
- Vegetation management and removal of selected trees
- Protection of retained trees
- Earthworks and ground preparation
- Landscaping and rehabilitation of disturbed areas
The work area extends between Sirius Drive and the Huntingfield Park & Ride facility.

Why Is This Project Being Delivered?
The project aims to:
- Improve pedestrian and cyclist safety
- Increase access to public transport
- Create a more connected active transport network
- Support healthier and more sustainable travel choices
- Improve accessibility for people of all ages and abilities
- Deliver a long-term community asset that supports future growth in the area

Protecting Trees
Council recognises the importance of existing trees to the area’s character. While some tree removal is required to build the path, Council has worked to minimise tree loss wherever practical.

Protecting Local Heritage
Council recognises the heritage significance of the Huntingfield area. Appropriate measures will be in place during construction to protect heritage values to ensure local history is protected while delivering important community infrastructure.
What Can Residents Expect During Construction?
During construction, residents and visitors may notice:
- Construction vehicles and machinery in the area
- Temporary changes to pedestrian access
- Temporary traffic management controls
- Reduced parking in some locations
- Construction noise during working hours
- Temporary fencing around work areas
Council and the Contractor will make every effort to minimise disruption and maintain safe access wherever possible.
Construction Hours
Construction is proposed to occur between 7am and 6pm subject to traffic permits requirements.
Should works outside normal construction hours become necessary, affected residents will be notified in advance wherever practicable.
Traffic and Access
Maintaining public safety will be a priority throughout the project.
Measures will include:
- Temporary signage
- Pedestrian detours where required
- Traffic management personnel when necessary
- Safe access to residences and properties
- Continued access to the Huntingfield Park & Ride facility wherever possible
Please follow all signs and directions when travelling near the work site.