Works

Active works and works commencing soon

Kingborough Council is responsible for the municipality’s roads, reserves, sports facilities, stormwater systems and solid waste management. In order to maintain the local infrastructure, we undertake a schedule of planned works every year. These works are a combination of ongoing maintenance work, as well as new capital projects.

We aim to provide an overview of works currently in the pipeline.

Dates and times are supplied with the best of accuracy but may change without notice . If start and completion dates are unknown at this stage a default financial year timeframe is set.

 

Project Name Address Schedule of Works Activity Type More Info
Adventure Bay path 920-1000 Adventure Bay Road, Adventure Bay 01/07/2021 - 30/06/2022 Pathway construction New
Dennes Point public toilet upgrade Nebraska Road, Dennes Point 01/07/2021 - 30/06/2022 Upgrade of public amenities Upgrade
Christopher Johnson Reserve Toilet refurbishment 59 Tyndall Road, Bonnet Hill 01/07/2021 - 30/06/2022 Refurbish public amenities Upgrade
Whitewater Creek Track rehabilitation Whitewater Creek Track, Kingston 01/07/2021 - 30/06/2022 Upgrade track to 3m wide concrete shared path Upgrade
Taroona Hall upgrade 6 Batchelor Way, Taroona 01/07/2021 - 30/06/2022 Construction works to upgrade the hall Upgrade
North West Bay River multi-use trail - stage 1 Riverdale Road, Sandfly 01/07/2021 - 30/06/2022 Construct 1.2m wide natural surface multi-use track to connect the end of Riverdale Rd to the Huon Hwy New
Margate Hall accessibility improvements 1744 Channel Highway, Margate 01/07/2021 - 30/06/2022 Installation of DDA access ramp and amenities Upgrade
KSC Solar Panels and Battery System Kingston View Drive, Kingston 01/07/2021 - 30/06/2022 New solar panel and battery system installation Upgrade
Kettering Public Toilet replacement 2963 Channel Highway, Kettering 01/07/2021 - 30/06/2022 Construction of new public amenities Upgrade
Boronia Beach Track refurbishment Boronia Beach 01/07/2021 - 30/06/2022 Track refurbishment including widening, edge stabilisation and surfacing Maintenance
Kingston Beach Oval changerooms Recreation Street, Kingston Beach 01/07/2021 - 30/06/2022 Changeroom improvements New
Allens Rivulet Road footway improvements 297-305 Allens Rivulet Road 01/07/2021 - 30/06/2022 Footway improvements Upgrade
Meath Avenue stormwater upgrade 1-27 Meath Avenue, Taroona 01/07/2021 - 30/06/2022 Stormwater upgrades and road reconstruction Upgrade
Kingston Wetlands upgrade Kingston Wetlands 01/07/2021 - 30/06/2022 Improve the Kingston Wetlands recreation area and water treatment Upgrade
Hillside Drive stormwater upgrade 23-44 Hillside Drive, Blackmans Bay 01/07/2021 - 30/06/2022 Stormwater upgrades Upgrade
Garnett Street stormwater upgrade Maddock Street, Blackmans Bay 01/07/2021 - 30/06/2022 Stormwater upgrades and improvements - Garnett, Maddock and Hazell St catchments Upgrade
Kingston Rivulet Flood Mitigation Denison Street, Kingston 01/07/2021 - 30/06/2022 Flood mitigation measures and infrastructure upgrades New
Bishop Davies to Kingston Green stormwater link Eleni Avenue, Kingston 01/09/2021 - 31/10/2021 New stormwater link and improvements New
Timbertop Drive - stormwater upgrade Timbertop Drive, Blackmans Bay 01/09/2021 - 30/11/2021 Stormwater upgrades and improvements Upgrade
Algona Road stormwater upgrade - stage 2 Opal Drive, Blackmans Bay 01/07/2021 - 31/12/2021 Additional stormwater upgrades vic. Algona Road Upgrade
Gemalla Road reconstruction Gemalla Road, Margate 01/07/2021 - 30/06/2022 Road reconstruction including pavement, kerb and channel, and footpath Upgrade
Wells Parade reconstruction between Carinya St & Illawarra Rd Wells Parade, Blackmans Bay 01/07/2021 - 30/06/2022 Road reconstruction, including pavement, kerb and channel, and footpath Upgrade
Kingston Park public open space - stage 2 Goshawk Way, Kingston 01/08/2021 - 31/01/2022 Public open space development including, bicycle and walking paths, toilet block, maintenance shed, picnic lawns, landscaping improvements, BBQ facilities and shelters. New Project Information
Taroona Crescent footpath replacement 1-58 Taroona Crescent, Taroona 01/07/2021 - 30/06/2022 Reconstruction of asphalt footpath on western side of road Upgrade
Snug Tiers Road reconstruction 42-120 Snug Tiers Road, Snug 01/07/2021 - 30/06/2022 Road reconstruction and extension of footpath Upgrade
Harvey Road sealing 21-54 Harvey Road, Alonnah 01/07/2021 - 30/06/2022 Asphalt sealing Upgrade
Cades Drive rehabilitation Cades Drive, Kingston 01/07/2021 - 30/06/2022 Road reseal and patching Maintenance
Burwood Drive gravel footpath 30-98 Burwood Drive, Kingston 01/07/2021 - 30/06/2022 New gravel footpath New
Browns Road rehabilitation - stage 1 19-51 Browns Road, Kingston 01/07/2021 - 30/06/2022 Road reconstruction including new concrete footpath Upgrade
Adventure Bay Road upgrade 290 Adventure Bay Road, Adventure Bay 01/07/2021 - 30/06/2022 Road widening and stormwater upgrade Upgrade
Snug River footbridge replacement Snug Beach, Snug 01/07/2021 - 30/06/2022 Replace existing bridge with new 1.8 metre aluminum footbridge Upgrade
Missionary Road coastal road protection Missionary Road, Barnes Bay 01/07/2021 - 31/10/2021 Coastal armouring and road protection works. Maintenance
Groombridges Road Sealing Groombridges Road, Kettering 26/04/2021 - 29/10/2021 Asphalt sealing and realignment of unsealed road. Upgrade